Technical operating
specifications (STEs)
The general operating rules (RGEs) contain the reactor's technical
operating specifications (chapter III of the RGEs). Their role is
• to define the normal operating
limits of the facility if it is to remain in conformity with the reactor
design basis scenarios;
• depending on the state of the
reactor in question, to define the safety functions necessary for
the monitoring, protection and safeguard of barriers as well as implementation
of incident and accident operating procedures;
• to specify the course of action
to be followed if a normal operating limit is exceeded or if a required
safety function is unavailable.
Permanent modifications to the STEs
EDF may be led to modify the STEs for various reasons: to take account
of experience feedback, to improve safety, to improve reactor economic
performance, or to take account of the consequences of changes made
to the equipment. These changes in the STEs require prior authorisation
by the ASN on the basis of safety justifications provided by EDF.
In 2005, the ASN reviewed a number of "amendment documents"
modifying the STEs, which were approved or are the subject of additional
justification requests. These include:
• an amendment document which
concerns the 900 MWe series reactors and aims to modify certain requirements
of the STEs to allow a rapid restoration of the national electricity
transport grid in the even of a "generalised grid incident"
(IRG);
• an STE amendment document concerning
the 1300 MWe series reactors and which aims to meet the ASN's requests
concerning risks during reactor outages
The ASN also reviewed the STE revision for the CPY and N4 plant series.
The ASN considers that EDF's document support policy, in particular
through highlighting the proposed changes, facilitates analysis and
review.
Temporary STE modifications
When a licensee considers that it is unable or does not wish, on safety
grounds, to comply strictly with STEs during an operating phase or a
maintenance operation, it must apply to the ASN for a waiver, on a case
by case basis. The ASN then analyses this request and may accept it,
if necessary provided that compensatory measures are taken.
The ASN keeps a close watch over the number of waivers granted. EDF
is therefore required:
• periodically to re-examine
the reasons for the waiver requests in order to identify those which
would justify adaptation of the STEs;
• to identify "generic"
waivers, in particular those linked to implementation of national
modifications and periodic tests.
The number of waivers examined in 2005 was 148, or an average of about
2.5 per reactor, per year. The three most commonly evoked reasons
for waiver requests in 2005 are linked to:
• the unavailability of reactor
systems and electrical sources during modification work or owing to
maintenance on the sources themselves;
• unavailability of equipment linked
to the safety injection system, as a result of remedial maintenance
work;
• maintenance on the nuclear auxiliaries
building ventilation system.
Although most waiver requests are granted, the ASN's waiver approvals
sometimes stipulate additional requirements owing to the inadequacy
of the palliative measures proposed by the licensee.
Field inspection of normal operation
During site inspections, the ASN checks:
• compliance with the STEs and,
as necessary, with the palliative measures associated with the waivers;
• the normal operating document
quality such as operating instructions or certain alarm sheets;
• consistency between the normal
operating documents and the STE;
• staff training in handling certain
"sensitive" reactor transients, such as mid-loop operation
(PTB RRA).
|