1. ASSESSMENT BY DOMAIN

1.1 The nuclear installations

Blayais nuclear power plant

ASNconsiders that the nuclear safety, radiation protection

and environmental protection performance of the

Blayais NPP is, on the whole, in line with its general

assessment of EDF’s performance.

ASN has noted the smooth running of the four reactor

outages for maintenance and refuelling. Although the

ten-year outages of reactors 3 and 4 ran concomitantly

and the site had occasional problems with procuring

various supplies, this situation had no notable effects on

the safety of the facilities. In this respect, the regulatory

inspections performed by ASN on the main primary

system of reactors 3 and 4 and on the main secondary

systems of reactor 3 revealed no particular malfunctions

of these systems.

However, as in 2014, ASNnoted that the site experienced

some difficulties in maintenance. The efforts must be

maintainedwith regard towork preparation, particularly

by ensuring as amatter of course that experience feedback

from similar operations is taken into account.

On the other hand, with regard to radiationprotection, ASN

notes that the site must improve the control of radiation

protection on the worksites conducted during the reactor

shutdowns. Several significant radiation protection events

particularly noteworthy were thus notified during the

shutdowns, one concerning an operator who received

a dose exceeding a regulatory limit when working on a

heat exchanger of the chemical and volumetric control

system of the primary system of reactor 4.

With regard to environmental protection, ASNnotes the

efforts made by the site to limit cooling fluid discharges.

Civaux nuclear power plant

ASN considers that the nuclear safety and environmental

protection performance of the Civaux site is on the whole

in line with ASN’s general assessment of EDF and that

the site’s radiation protection performance stands out

positively with respect to the said general assessment.

The scheduled outage for partial inspection of reactor 2

went well on the whole. It was marked in particular by

the performance of themain secondary systemhydraulic

test. ASN considers that the licensee must continue the

efforts undertaken since 2014 regarding rigour in the

preparation, performance and inspection of certain

operating and maintenance activities.

BORDEAUX DIVISION

ASN inspection at the Civaux NPP, June 2015.

228

CHAPTER 08 :

REGIONAL OVERVIEW OF NUCLEAR SAFETY AND RADIATION PROTECTION

ASN report on the state of nuclear safety and radiation protection in France in 2015