ASN and IRSN subsequently examine the operating

feedback from the events. The assessment by ASN, the

significant event reports and the periodic reviews sent by

the licensees constitute the basis of operating experience

feedback. This experience feedback can lead to requests

for improvement of the condition of the facilities and the

organisation adoptedby the licensee, aswell as for changes

to the regulations.

Operating experience feedbackcomprises the eventswhich

occur inFrance andabroad if it is pertinent to take theminto

account inorder to reinforce safety or radiationprotection.

3.3.3 Technical inquiries held in the event of

an incident or accident concerning a nuclear activity

ASNhas the authority to carry out an immediate technical

inquiry in the event of an incident or accident in a nuclear

activity. This inquiry consists in collecting and analysing

all useful information, without prejudice to any judicial

inquiry, in order to determine the circumstances and the

identified or possible causes of the event, and draw up

the appropriate recommendations if necessary. Articles

L. 592-35 and following of the Environment Code give

ASNpowers to set up a commission of inquiry, determine

its composition (ASNstaff andpeople fromoutside ASN),

define the subject and scope of the investigations and

gain access to all necessary elements in the event of a

judicial inquiry.

Decree 2007-1572 of 6th November 2007 on technical

inquiries into accidents or incidents concerning a nuclear

activity specifies the procedure to be followed. It is based

on the practices established for the other investigation

bureaus and takes account of the specific characteristics

of ASN, particularly its independence, its ability to impose

prescriptions or penalties if necessary and the concurrence

of its investigative and other duties.

GRAPH 5:

Events involving safety in NPPs, notified in 2015

Total 601

290

191

51

39

16

1

4

9

Design, manufacturing or assembly anomaly

Inadvertent start-up of a protection or safeguard system

Event or anomaly specific to the primary or secondary system

Transition to shutdown state in accordance with STE

or accident procedures

Automatic reactor trip

Other significant events which could affect safety

Event which caused or could cause multiple failures

Deviation from Operational Technical Specifications (STE)

or event which could lead to a deviation

GRAPH 6:

Events involving safety in BNIs other than NPPs notified in 2015

Total 178

Fault, deterioration or failure which affected a safety function

On-site or off-site hazard affecting the availability of important equipment

Event which caused or could cause multiple failures

Inadvertent start-up of a protection or safeguard system

Event actually or potentially affecting the containment of hazardous

materials

Other significant events which could affect safety

Event affecting a safety function and potentially constituting an accident precursor

2 1

80

29

28

21

13

4

Event which led to safety limit(s) being exceeded

145

CHAPTER 04:

REGULATION OF NUCLEAR ACTIVITIES AND EXPOSURE TO IONISING RADIATION

ASN report on the state of nuclear safety and radiation protection in France in 2015