1. ASSESSMENT BY DOMAIN

1.1 The nuclear installations

Nogent-sur-Seine nuclear power plant

ASN considers that the nuclear safety, radiation protection

and environmental protection performance of the Nogent-

sur-Seine NPP is, on the whole, in line with its general

assessment of EDF performance.

With regard to the operational control of the reactors

and operating rigour, ASN considers that the site’s

performance is generally satisfactory except during the

restarting of reactor 2 after its outage for maintenance,

during which five significant events were notified on

account of organisational deficiencies in the operational

control of the installations or equipment tests. As a

general rule, the site must better formalise the rules

applicable to the preparation of operational control

activities and shifts changes.

With regard to maintenance, ASN considers that the

scheduled and unscheduled outages were on the whole

satisfactorily managed from the safety aspect. ASN does

nevertheless note shortcomings in the preparation of the

activities and occasionally in the organisational measures

adopted. Some events underline the importance of

providing outside contractors with appropriate operating

documents that are in conformity with the equipment.

Improvements are moreover expected in the tracking

of the files for maintenance operations carried out by

outside contractors while the reactors are in operation.

With regard to radiation protection, several events that

occurred in 2015 – particularly one concerning a spot

contamination of a worker which led to skin exposure

exceeding a quarter of the regulatory annual individual

dose limit(event rated level 1 on the INES scale) –

highlight the need for the site to reinforce its radiation

protection culture.

Lastly, with respect to environmental protection,

ASN observes that shortcomings in the integration of

experience feedback and a lack of rigour resulted in

failure to avoid occasional discharges

via

a discharge

channel not intended for that purpose.

Chooz nuclear power plant

ASNconsiders that the nuclear safety, radiation protection

and environmental protection performance of the

Chooz B NPP is, on the whole, in line with its general

assessment of EDF’s performance.

ASNobserves that, despite themeasures taken to reinforce

and stabilise the operating teams, the situation remains

tenuous with respect to the available human resources.

More generally, the operating experience feedback from

events occurring on the site must be improved.

With regard to maintenance, ASN is still observing

shortcomings in the preparation or quality of operations.

These shortcomingswere the root causeof several significant

events in 2015 and led to delays that deteriorated the

working conditions during the reactor outages.

With regard to radiation protection, ASN considers that

the actions taken to improve the performance of the site in

terms of radiological cleanness of themaintenanceworksites

have so far not been sufficient to prevent the renewal of

recurrent deviations, such as noncompliance with the

rules for donning personal protective equipment and self-

monitoring for entering or leaving areas that could be

contaminated. Furthermore, a lack of rigour in individual

behaviours hinders the site’s performance in this area.

Lastly, with regard to environmental protection, ASN

considers that operating experience feedback is adequately

integrated, although there are still some traceability and

recording deviations. The site must continue its efforts

in this area.

Labour inspection in the nuclear power plants

ASNcontinueditsinspectionsofhealthandsafetyconditions

given the large number of maintenance activities.

The health and safety measures taken by the licensee are

satisfactory in the majority of cases. Nevertheless, ASN

still observes that the risk analyses prior to maintenance

operations are insufficient and that theworking conditions

do not always minimise the risks for the personnel.

Lastly, the year 2015wasmarked inparticular by several falls

fromheight and several cases of radioactive contamination

on the sites.

The Soulaines-Dhuys waste repository

and the Bure laboratory

ASN considers that operation of the CSA repository is

satisfactory, in line with the previous years.

In 2015 Andra completed the modification work on the

package inspection facility designed toprovide the facility

withhigh-performance inspection ressources to check the

quality of the packages receivedby it. The commissioning

by it, planned for 2016, is subject to ASN approval.

Construction of the disposal structures of tranche 9, for

which ASN has given its agreement, continued in 2015.

ASN also gave its agreement in 2015 on themodification

of the general operating rules of the CSA, with the aimof

integrating the updating of the regulatory requirements,

including those of the BNI Order of 7th February 2012,

and making these rules more practical and usable.

ASN considers that works conducted by Andra in the

underground laboratory at Bure continued in 2015with

a good standard of quality comparable with that of the

preceding years.

240

CHAPTER 08 :

REGIONAL OVERVIEW OF NUCLEAR SAFETY AND RADIATION PROTECTION

ASN report on the state of nuclear safety and radiation protection in France in 2015