Table of Contents Table of Contents
Previous Page  276 / 536 Next Page
Information
Show Menu
Previous Page 276 / 536 Next Page
Page Background

1. ASSESSMENT BY DOMAIN

1.1 The nuclear installations

Belleville-sur-Loire nuclear power plant

ASN considers that the performance of the Belleville-

sur-Loire NPP is on the whole in line with the general

assessment of EDF in the areas of safety, security and

radiation protection. Its environmental performance has

improved with respect to 2014.

With regard to nuclear safety, although operating rigour

has improved in certain activities (satisfactory configuring

of the systems and compliancewith the operating technical

specifications), other activities, notably those relating to the

periodic tests of equipment, deteriorated verymarkedly in

2015 andmust constitute one of the site’smain focuses for

improvement in2016. In addition, ASNconsiders that the

licensee must continue its efforts in the implementation

and adaptation of its national technical directives.

In the area of occupational radiation protection, the site’s

performance is in linewith the average for theEDF reactors.

However, several events that occurred essentially during

the reactor 2outage indicateweaknesses inmaintaining the

radiological cleanness of the premises even though activity

scheduling and work quality were not faulted in 2015.

With regard to pollution prevention and control of the

impact and nuisance for the public and the environment,

the site’s performancemade significant progress in2015and

is approaching the general assessment of EDF. The actions

undertakenby the site sinceASNresolution 2013-DC-0390

of December  2013 and the “environmental rigour plan”

implementedby the licensee have contributed to the site’s

recovery and confirmthat environmental issues are being

truly taken into account in the site’s general organisation,

which must now be developed and sustained over the

long termwith all the actors.

Chinon site

ASNconsiders that the performance of theChinonNPP is

on thewhole in linewith the general assessment of EDF in

the areas of safety, andenvironmental protection. It considers

that theplant’s radiationprotectionperformance stands out

positively with respect to the general assessment of EDF.

With regard to safety, ASNhad indicated in 2015 that the

Chinon site’s performance was showing an improvement,

which justified the return to a normal inspection rhythm in

2015, after the tightened surveillancemeasures which had

prevailed from2010 to 2014. It observes thatmanagement

of the periodic tests, which was still identified as a weak

point in 2014, has improved. Although the organisation

put in place seems satisfactory, particular vigilance is

required in themonitoring of outside contractors. Taken

generally, ASNconsiders that the procedures deployed by

the Chinon site over the last fewyears to anchor the error-

reduction practices in the activities must be continued.

The radiation protection organisation of the ChinonNPP is

considered satisfactory. The inspections carried out during

the reactor outages have revealed good management of

ORLÉANS DIVISION

I

n 2015,

ASN carried out 201 inspections in the Centre, Limousin and Ile-de-France regions

in 2015, comprising 82 inspections of nuclear installations on the EDF sites of Belleville-sur-

Loire, Chinon, Dampierre-en-Burly and Saint-Laurent-des-Eaux, 35 inspections of nuclear

sites in Ile-de-France (CEA Saclay and Fontenay, CIS bio international Saclay), 77 inspections in

small-scale nuclear activities and 7 inspections in the transport of radioactive substances. ASN

also ensured 18 days of labour inspection in the nuclear power plants.

A campaign of tightened inspections on the theme of the environment were carried out on the

Chinon, Dampierre-en-Burly, Saint-Laurent-des-EauxNPPs, and also the Nogent-sur-Seine NPP,

with the aimof identifying areas for improvement in this domain at both local and national level.

In 2015, 7 significant events rated level 1 on the INES scale were notified by the licensees of

EDF nuclear installations in the Centre region, and 4 significant events of level 1 were notified

by the licensees of the Ile-de-France nuclear sites. In the small-scale nuclear activities, 3 events

of level 1 on the ASN-SFRO scale were notified in the Centre and Limousin regions.

On the basis of the inspections conducted by the Orleans division, ASN inspectors drew up one

violation report which was submitted to the competent Public Prosecutor.

276

CHAPTER 08 :

REGIONAL OVERVIEW OF NUCLEAR SAFETY AND RADIATION PROTECTION

ASN report on the state of nuclear safety and radiation protection in France in 2015