Finally, for the thirty or soother facilities of lesser importance

(batch 3), ASN set out a calendar on 21st November 2013

for CEA to submit the stress test reports, a process which

will run until 2020 (see figure 2).

Given the available resources, it was not possible to review

the files submittedbyCEAandAreva in2015within a time-

frame compatiblewith the prescriptions of January  2015,

which could lead to delays in the implementation of the

provisions of the “hardened safety core”.

On 8th January 2015, ASN set requirements for CEA

associated with the equipment and provisions of the

“hardened safety core” for the facilities and centres

which so require, along with the deadlines for their

implementation, which should continue until 2018 (see

figure 1). For the Saclay centre, CEA released its stress

tests report on 30th June 2013. It was reviewed until

2015; ASNprescribed the requirements associatedwith

the equipment and provisions constituting the centre’s

“hardened safety core” on 12th January 2016.

FIGURE 1:

CEA centres and facilities, ILL and CIS bio international

concerned by the “hardened safety core” additional prescriptions

in 2015

FIGURE 2:

research facilities concerned by the stress tests

prescribed in november 2013 (batch 3)

CEA centre

- CEA Cadarache centre

- CEA Marcoule centre

- CEA Saclay centre

Research facilities operated by CEA

- Cadarache Site: Cabri, Jules Horowitz Reactor

- Marcoule Site: Phénix

- Saclay Site: Orphée

Facility operated by the Institut Laue-Langevin

- Grenoble: High-Flux Reactor

Facility operated by CIS bio international (project)

- Saclay: Radiopharmaceuticals production plant

Paris

Saclay

Marcoule

Cadarache

Paris

Fontenay-aux-Roses

Soulaines

Saint-

Laurent-des-Eaux

Chinon

Sablé-sur-Sarthe

Pouzauges

Dagneux

Bugey

Tricastin

Cadarache

Marcoule

Malvési

Marseille

Maubeuge

Caen

Beaumont-

Hague

Saclay

6 EDF facilities

- MIR (Chinon and Bugey)

- BCOT (Tricastin)

- AMI (Chinon)

- The Saint-Laurent-des-Eaux silos

6 accelerators and irradiators

- Ganil (Caen)

- Ionisos (Dagneux, Sablé-sur-Sarthe, Pouzauges)

- Synergy Health (Chusclan, Marseille)

2 LLW/ILW waste storage facilities (Andra)

- Aube Disposal Centre (CSA) (Soulaines)

- Manche Disposal Centre - CSM (Beaumont-Hague)

2 AREVA group facilities

-

Écrin (Comurhex Malvési)

- Somanu (Maubeuge)

18 CEA facilities

- 11 BNIs at Cadarache

- 4 BNIs at Saclay

- 2 BNIs at Fontenay-aux-Roses

- Diadem (Marcoule)

Grenoble

437

CHAPTER 14:

NUCLEAR RESEARCH AND MISCELLANEOUS INDUSTRIAL FACILITIES

ASN report on the state of nuclear safety and radiation protection in France in 2015